期刊文献+

浅淡综采工作面过断层技术与实践 被引量:1

Technology and Practice of Passing through Fault in Fully Mechanized Coal Mining Face
下载PDF
导出
摘要 针对山西河曲晋神磁窑沟煤业有限公司10103综采工作面开采过程中遇见断层情况进行研究,分析该工作面主要情况,探讨断层矸石对过断层的影响,主要采用放松动炮的办法解决矸石的影响。通过"一粘二填三擦顶"的方法,有效控制断层附近破碎顶板,减少工作面支架倒架、咬架现象的发生。 According to the study on the fault condition in mining process in 10103 fully mechanized coal face in Jinsheng Ciyaogou Coal Industry Co., Ltd. of Hequ in Shanxi, this paper analyzed its main conditions of working face, explored the influence of the gangue on passing through fault, mainly adopted blasting vibration to solve the influence of gangue. "Firstly stick,secondly fill and thirdly wear top roof" method can effectively control breaking roof near fault, and reduce the occurrence phenomenon of the fall and slanting support in the working face support.
作者 段春生
出处 《能源与节能》 2015年第10期161-162,共2页 Energy and Energy Conservation
关键词 综采 断层 矸石 放炮震动 fully mechanized fault waste rock blasting vibration
  • 相关文献

参考文献4

共引文献55

同被引文献9

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部