泵试验台过程控制及数据采集设计 被引量:3

Design of Process Control and Data Acquisition for the Pump Test Bench
下载PDF
导出
摘要 为了准确快速的测试泵的水力性能,对新建的泵试验台的过程控制和数据采集提出了严苛的要求;根据这些要求,引入了PLC控制系统、变频器电机拖动系统、数据采集系统及组态界面,并采用以太网网络将各个分散的部分联结成一个整体;经过一年多的运行表明该试验台操作简便,过程控制可靠,数据采集稳定准确,能够快速准确地测试出泵的水力性能并记录打印出来,完全实现了最初的设计要求。 In order to test the hydraulic performance of the pump accurately and quickly, the process control and data acquisition of the newly built pump test bench are put forward with stringent requirements. Based on these requirements, PLC control system, inverter motor drive system , data acquirement system and configuration interface are applied and linked together by Ethernet. It indicates that this pump test bench has simple operation, reliable process control, stable and accurate data acquisition after more than a year of running. The hydraulic performance of pump can be tested quickly and accurately and the test record printed simply. The original design requirements are fully realized.
出处 《计算机测量与控制》 2015年第10期3389-3394,共6页 Computer Measurement &Control
关键词 PLC 变频器 数据采集 组态界面 以太网 PLC inverter data acquirement configuration interface Ethernet
  • 相关文献

参考文献5

  • 1SIEMENS.SINAMICSG120变频器0.37kW至250kW.西门子(中国)有限公司.产品样本D11.3,2013.
  • 2SIEMENS.sINAMICSG120控制单元CU240B-2控制单元CU240E-2.西门子股份公司.参数手册01/2013.
  • 3SIEMENS.使用OpenCommunicationWizard建立开放式TCP通信.西门子(中国)有限公司.06/2014.
  • 4SIEMENS.SINAMlCSG120与S7-300之间的DP通讯.西门子(中国)有限公司.08/2009.
  • 5陈健,杨振坤,童诗存,魏峰.基于TRF6900的远程数据采集系统的设计与实现[J].计算机测量与控制,2006,14(8):1119-1121. 被引量:3

二级参考文献3

  • 1TI Company.TRF6900A Datasheet[Z].TEXAS Instruments.2000.
  • 2TI Company.Implementing a Bidirectional,Half-Duplex FSK RF Link With TRF6900 andMSP430[R].Application Report.TEXAS Instruments.2001.
  • 3TI Company.TRF6900 Evaluation Board User's Guide[Z].Application Manual.TEXASInstruments.2000.

共引文献2

同被引文献21

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部