针对姚家坪水电枢纽原设计方案的缺陷,对枢纽原设计方案进行了优化,主要介绍了枢纽布置及大坝用料方案的优化,对方案优化前后的成果进行了对比分析,结果表明,优化方案不仅节约了工程投资,而且实际运行效益显著。
The optimization of the design for Yaojiaping Hydropower Project is introduced,including specifically the optimization of the project layout and the dam construction materials. Comparison shows that the project investment can be saved and greater operation benefit can be obtained after the optimization.