摘要
介绍了华山沟电站砾石土土工膜心墙堆石坝坝体分区、筑坝材料、土工膜选择及填筑要求、土工膜和砾石土与地基及两岸岸坡的连结、基础处理,这些措施确保了砾石土和土工膜心墙的防渗作用。
Design details of the geomembrane gravelly soil core rockfill dam in the Huashangou Hydropower Station are introduced,including the embankment zoning,filling materials,choosing of the geomembrane,requirements of the filling construction,connections between the geomembrane gravelly soil core and the foundation and bank slopes,and the foundation treatment. With these measures,the seepage proofing ability of the geomembrane gravelly soil core is ensured.
出处
《水电与新能源》
2015年第10期27-29,共3页
Hydropower and New Energy
关键词
砾石土
土工膜心墙
堆石坝
防渗
gravelly soil
geomembrane core
rockfill dam
seepage proofing