期刊文献+

基于6.6kV高压电容器的选煤厂无功改造 被引量:2

Based on Coal Preparation Plant 6.6 kV High Voltage Capacitor Reactive Power Transformation
下载PDF
导出
摘要 通过对淮北矿业集团某选煤厂容量增加后,出现功率因数降低的原因进行分析,得出无功功率增加的原因,采用增加高压补偿电容的方法对该厂的无功功率补偿,计算出所需补偿的无功容量及设计了电容的布置方式。改造后,功率因数得到提高,改善了企业用电质量,节约了用电成本,取得了明显的经济效益。 Capacity causes which the reason of reactive power increase was increasing of lower power factor was analyzed in the mining group Huaibei coal preparation plant. By increasing the voltage capacitance compensation of reactive power compensation was adopted to calculate the required compensation of reactive power capacity and designed layout of the capacitor in the plant. After the transformation, the power factor was enhanced, to improve the quality of electricity, saving electricity costs, and obtain obvious economic benefit.
作者 张立 唐敏
出处 《煤矿机械》 2015年第10期210-212,共3页 Coal Mine Machinery
基金 安徽省质量工程项目(2012sjjd075) 安徽省质量工程项目(20101905) 安徽省质量工程项目(2012zy133)
关键词 无功功率 电容 补偿 reactive power capacitor compensation
  • 相关文献

参考文献5

二级参考文献9

共引文献19

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部