摘要 以具有不同需求的不同服务分配到最佳资源并得到最优处理为研究目标,提出划分逻辑子网的策略,在分析云滴概念的基础上,提出云滴Web服务节点距离的定义,基于谐振子理论方法,寻求最优路径选择策略,抽象出一种应用服务调用的实现框架.实验证明:可以保证所得调度方案满足服务优先关系约束,充分表明该方法的有效性. With the research objective of taking different services of different demands dispatched to the optimal resources and be optimally treated,a strategy of classifying logic subnet was put forward.The definition of cloud droplet Web service nodewas put forward based on the harmonic oscillator theoretical method,andthe optimal route selection strategy was obtained and a realization framework applied in service scheduling was abstracted.Through experiments it is proven that the strategycan guarantee the scheduling scheme acquired to satisfy the restriction from service precedence relation,and the effectiveness of this method has fully demonstrated.
出处 《北京工业大学学报》 CAS CSCD 北大核心 2015年第10期1537-1542,共6页 Journal of Beijing University of Technology
基金 辽宁省自然科学基金资助项目(201204796) 辽宁省教育厅科学研究项目(L2012489)
关键词 服务调度 路径优化 谐振子理论 service scheduling path optimization harmonic oscillator theory
  • 相关文献

参考文献15

二级参考文献72

  • 1郑超,高连生.蚁群算法在资源受限项目调度问题中的应用[J].计算机工程与应用,2005,41(27):205-208. 被引量:16
  • 2雒兴刚,汪定伟,唐加福.任务可拆分项目调度问题[J].东北大学学报(自然科学版),2006,27(9):961-964. 被引量:8
  • 3刘书雷,刘云翔,张帆,唐桂芬,景宁.一种服务聚合中QoS全局最优服务动态选择算法[J].软件学报,2007,18(3):646-656. 被引量:146
  • 4李丹,张宏国.资源约束下多项目再调度算法[J].信息技术,2007,31(4):16-18. 被引量:5
  • 5HERROLEN W, REVCK B D E. Resource-constrained project scheduling: a survey of recent developments[J]. Computers & Operations Research, 1998, 25(4) :279- 302.
  • 6WEGLARZ J. Project scheduling: recent models, algorithms and applications [M]. Amsterdam, Netherlands:Kluwer, 1999.
  • 7ALAGOZ O, AZIZOGLU M. Rescheduling of identical parallel machines under machine eligibility constraints[J].European Journal of Operational Research, 2003, 149(1) :523-532.
  • 8SAKOUT H E, WALLACE M. Probe backtrack search for minimal perturbation in dynamic scheduling[J]. Constraints, 2000, 5(4) :359-388.
  • 9KAO H P, WANG B, DONG J, et al. An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling [J]. Computers in Industry, 2006, 57 (5) 379-397.
  • 10SPRECHER A, DREXL A. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm[J]. European Journal of Operational Research, 1998, 107(1) :431--450.