期刊文献+

投标企业项目管理实力评价指标及方法研究 被引量:1

Research of evaluation index and methods of the project management strength of the bidding enterprises
下载PDF
导出
摘要 以业主委托工程监理单位实施工程项目建造管理体制为背景,研究构建基于大数据时代的互联网项目管理协同平台客观记载投标企业施工项目管理能力的第三方统计要素的量化评价指标体系。指标权重的确定采用避免一致性反复检验的模糊层次分析法,并根据评价期内投标企业施工项目管理实力评价指标数据分为波动小的年度指标和波动大的季度指标,研究指标评价方法。对于反映投标企业施工项目管理实力趋势的评价,波动小的年度指标评价根据指标值是否呈现递增或递减趋势分别采取线性拟合插值法和均值法,波动大的季度指标评价采用马尔科夫预测方法,最后采用模糊综合评价法对企业项目管理实力进行评价,并实例验证了评价方法的可行性。 Under the background of the management system which proprietor commissions the construction super-vising units to implement the construction of project,the quantitative evaluation index system of the project man-agement strength of the bidding enterprises was built which is more objective to record the project management capabilities and is counted by the third party relying on the internet era of big data project management coordina-tion platform.The weight determination of indexes uses Fuzzy Analytic Hierarchy Process to avoid consistency in-dex weights repeatedly tested.The system of index was divided into annual indexes with small fluctuation and quarter indexes with big fluctuation.And then the evalution method of the project management strength of the bidding enterprises was studied.A linear fitting interpolation and the average method were utilized to evaluate those annual indexes which depends on whether show an increasing or decreasing trend.While the Markov Forca-sting method was utilized evaluate those quarter indexes in order to reflect the trend evaluation of the project man-agement strength of the bidding enterprises.Finally the feasibility of the model was verrfied by an example.
作者 邓铁军 毛颖
出处 《铁道科学与工程学报》 CAS CSCD 北大核心 2015年第5期1256-1262,共7页 Journal of Railway Science and Engineering
基金 湖南省科技计划一般资助项目(2012GK4025)
关键词 投标企业 项目管理实力 评价指标 评价方法 bidding enterprises project management strength evaluation index evaluation method
  • 相关文献

参考文献14

  • 1湖南省住房和城乡建设厅.湖南省房屋建筑和市政工程施工招标评标活动管理规定[Z].2010-12-06.
  • 2邓铁军.工程建设项目管理[M].(3版)武汉:武汉理工大学出版社,2013.
  • 3中华人民共和国主席令第二十一号.中华人民共和国招标投标法[S],2000.
  • 4Flanagan R, Lu W, Shen L, et al. Competitiveness in construction : a critical review of research [ J ]. Construc- tion Management and Economics, 2007, 25 (9) : 989 - 1000.
  • 5Merna A, Smith N J. Bid evaluation for UK public sector construction contracts [ M ]. London: in Proc Insttution of Civil Engineers, 1990:91 - 105.
  • 6SHEN Q, LIU G. Critical success factors for value man- agement studies in construction [ J ]. Journal of Construc- tion Engineering and Management, 2003, 129 ( 5 ) : 485 -491.
  • 7Photios G Ioannou, Sou - Sen Leu. Average bid method-a competitive bidding strategy. Journal of Construction Engi- neering and Management, ASCE, 1993 ( 1 ) : 131 - 147.
  • 8陈永高,孙文建.基于主成分分析法的建筑企业竞争力评价研究[J].施工技术,2007,36(12):33-35. 被引量:10
  • 9Basirat Baygi M, Hashemkhani Zolfani S, Rezaeiniya N, et al. Using fuzzy AHP to develop intellectual capital e- valuation model in hotel industry [ J ]. European Journal of Scientific Research, 2011, 59(2): 170- 178.
  • 10张英,冯艳芳.基于模糊层次分析法的大学生综合素质评价[J].武汉理工大学学报(社会科学版),2007,20(5):707-710. 被引量:65

二级参考文献9

共引文献514

同被引文献13

  • 1赵秋林,魏军政.秦岭终南山特长公路隧道竖井设计及施工方法探讨[J].公路,2005,50(8):164-167. 被引量:27
  • 2袁学武.导井法施工竖井的工艺探讨[J].四川水力发电,2007,26(3):85-87. 被引量:4
  • 3杨建国.公路山岭隧道施工期衬砌及结构系统可靠性研究[D].西安:长安大学,2011.
  • 4Christer. Carllsson, Robert, Fuller. A fuzzy approach toreal option valuation[J]. Fuzzy sets and Systems, 2003,139(4) :297-313.
  • 5Wang M J J. Fuzzy set evaluation of inspectionperformance [J]. International Journal of Man-machineStudies,1991,35(4) :587-596.
  • 6Eldukair Z A, Ayyub B.. Multi-attribute fuzzy decisionsin construction strategies [J]. Fuzzy Sets and Systems,1992,42(2) :155-165.
  • 7Walton J, Whicker. Virtual enterprise: myth and reality[J]. Journal of Control, 1996(3) :88-96.
  • 8Lim Hye-Sook, Lee Jin-Soo, Chon Hyo-Taek, et al.Heavy metal contamination and health risk assessment inthe vicinity of the abandoned Songcheon Au-Ag mine inKorea [J]. Journal of Geochemical Exploration, 2008(96) : 223-230.
  • 9颜红艳,张飞涟,王燕,邓永红.Partnering项目合作伙伴选择的群组决策方法[J].铁道科学与工程学报,2011,8(2):119-122. 被引量:5
  • 10陈红,周继彪,王建军,李晓伟,甘佐贤.公路隧道运行环境安全评价指标与方法[J].长安大学学报(自然科学版),2013,33(4):54-61. 被引量:43

引证文献1