摘要 上海申能崇明燃机电厂工程为2台9F级的燃气—蒸汽联合循环机组。其轴系由高压缸(HP)、中低压缸(IP-LP)、发电机(GEN)、燃机(GT)构成,呈单轴布置。轴系作为转动设备的核心部位,其安装调整质量将直接影响机组最终的振动。因此,根据以往的施工经验,对9F燃机轴系的要点作了总结,以便于今后同类机组的轴系调整安装。 The project of Shanghai Shenergy Chongming Gas Turbine Power Plant is two 9F-level gas-steam combined circulating units.The shafting consists of high pressure cylinder(HP),middle and low pressure cylinder(IP-LP),generator(GEN)and gas turbine(GT),presenting a monopodium arrangement.The installation and adjustment quality of shafting as the kernel part of rotating equipment,will directly influence the final vibration of an assembling unit.Therefore,in accordance with our construction experience in the past,the key points in the shafting alignment of 9F gas turbine are concluded,aiming to help the adjustment and installation of shafting of the same kind in the future.
作者 乐中杰
出处 《企业技术开发》 2015年第9期38-40,共3页 Technological Development of Enterprise
关键词 9F燃机 轴系找中 单轴 9F gas turbine shafting alignment monopodium
  • 相关文献

参考文献2

  • 1建标[2006]102号,中华人民共和国工程建设标准强制性条文(电力工程部分)[S].
  • 2DL/T 5210.3-2009,电力建设施工质量验收及评价规程(第3部分:汽轮发电机组)[S].

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部