巴基斯坦阿莱瓦水电站引水隧洞分级接力出渣施工技术 被引量:1

Step-by-step Mucking Technology in Diversion Tunnel of Allai Khwar Hydropower Station in Pakistan
下载PDF
导出
摘要 结合巴基斯坦阿莱瓦水电站引水隧洞纵坡为38.27%斜井段的特殊施工条件,介绍卷扬机分级接力出渣施工技术的设计与应用。在长达2年开挖与支护施工期间,特别是在首次采用多循环、多工序,而且复杂的有轨分级接力运输出渣模式下,未发生重伤以上安全事故。该施工技术获得业主的高度评价。 The paper introduces the design and application of step-by-step mucking by winch in combination with the special conditions for constructing the inclined section (with longitudinal slope of 38.27% ) of power tunnel of the project. No major safety accidents occurred during two years' excavating and supporting construction, even under the multi-cycle, multi-process and complicated railed step-by-step mucking mode for the first time. This construction technology receives high appraise from the EmDlover.
出处 《红水河》 2015年第5期11-14,19,共5页 Hongshui River
关键词 巴基斯坦阿莱瓦水电站 引水隧洞 出渣 Khwar Allai hydropower station in Pakistan diversion tunnel mucking
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部