摘要
以山西某2×300 MW级电厂工程贮灰场为实例,对山谷干贮灰场采用初期坝前堆灰和库尾堆灰两种不同的运行方式进行了研究,研究结果表明,采用初期坝前堆灰运行方式既经济又安全,该工程贮灰场应优先采纳坝前堆灰方案。
Taking a 2 × 300 MW level power plant engineering ash storage field in Shanxi as an example,this paper researched the valley dry ash storage field using initial dam ash deposit and tail of water reservoir ash deposit two different operation modes,the results showed that using initial dam ash deposit operation economy and security,the engineering ash storage field should priority with dam ash deposit scheme.
出处
《山西建筑》
2015年第31期207-208,共2页
Shanxi Architecture
关键词
火力发电厂
山谷干贮灰场
初期坝前堆灰
库尾堆灰
thermal power plant
valley dry ash storage field
initial dam ash deposit
tail of water reservoir ash deposit