摘要
分析相关规范和规程对双管法高压旋喷桩的规定,根据泉州市东海片区淤泥层采用双管法高压旋喷桩的施工试验,选择成桩直径与施工工艺参数,分析工艺参数对成桩效果及工程造价、进度的影响。
Analysis of relevant rules and regulations of the provisions of the double tube of high pressure jet grouting pile method,according to the quanzhou area of the east China sea silt layer using the double tube method,the construction of the high pressure jet grouting pile test,select the diameter of pile and the construction technology parameters,analysis of process parameters on the effect of pile and the impact of the project cost、schedule.
出处
《福建建筑》
2015年第10期78-80,共3页
Fujian Architecture & Construction
关键词
高压喷射注浆法
双管法旋喷
工艺参数
施工试验
工程造价
High pressure jet grouting method
Rotary spray double tube method
The process parameters
Construction test
The project cost