摘要
新钢二铁厂4座1 050 m3高炉采用多项节能工艺,改进部分操作手段,加强能源管控等方式,进一步降低了高炉能耗,实现了经济冶炼.
Four 1050 m3 blast furnaces in XIN - steel are modified with a number of energy - saving technologies. The en- ergy consumption is further reduced and the economic smelting is achieved by improving the operation and strengthening the energy control.