7Chang G W,Aganagic M,Waight J G,et al.Experiences with mixed integer linear programming based approaches on short-term hydro scheduling[J].IEEE Trans on Power Systems,2001,16(4):743-749.
8Arnold E,Tatjewski P,Wolochowicz P.Two methods for large-scale nonlinear optimization and their comparison on a case study of hydropower optimization[J].Journal of Optimization Theory and Applications,1994,81(2):221-248.
9Lyra C,Ferreira L R M.A multi-objective approach to the short-term scheduling of ahydroelectric powers ystem[J].IEEE Trans on Power Systems,1995,10(4):1750-1755.
10Naresh R,Sharma J.Hydro system scheduling using ANN aproach[J].IEEE Trans on Power Systems,2000,15(1):388-395.