核电厂一回路压力边界死管段止回阀及缺陷管道更换项目可靠性管理 被引量:4

Reliability Management for the Project of Pipe Dead End Check Valve and Defect Pipeline Replacement in Nulear Power Plant
下载PDF
导出
摘要 核电厂一回路压力边界存在的死管段现象易导致设备缺陷,对主冷却剂泄漏率控制具有重大影响,此类缺陷处理的技术难度和标准很高。本文对某核电厂实施的国内首次死管段止回阀及缺陷管道更换项目进行了分析,结果证明,通过技术方案保守分析和选择、采用故障树分析法确定项目风险点并进行分类、采用鱼骨图分析法确定风险管控措施并分阶段进行过程控制等,可提高项目管理的可靠性。 Pipe dead end conditions in primary loop pressure boundary of nuclear power plant easily lead to equipment defects that have a signi.cant impact on the coolant leakage rate control,and it is hard to deal with the defects. By analysis of the first domestic project of pipe dead end check valve and defected pipeline replacement in a nuclear power plant,it proved that the project reliability can be improved through conservative analysis and selection of technical solutions,project risks identification and classification by failure tree analysis,risk control measures determination by fishbone diagram analysis and phased process control.
出处 《核安全》 2015年第3期71-76,共6页 Nuclear Safety
关键词 死管段 止回阀 应急预案 故障树分析 鱼骨图 可靠性管理 pipe dead end check valve contingency plan failure tree analysis shbone diagram reliability management
  • 相关文献

参考文献10

二级参考文献25

  • 1王然,马智宏,衷爱东,杨赞.信息化项目风险管理策略的机理模型和应用分析[J].交通与计算机,2005,23(2):72-75. 被引量:6
  • 2全国一级建造师执业资格考试用书编写委员会.建设工程项目管理[M].北京:中国建筑工业出版社,2011.
  • 3GB/T50326-2006,建设工程项目管理规范[S].
  • 4港珠澳大桥主体工程建设项目管理制度(第一至三层级,第2版)[R].珠海:港珠澳大桥管理局,2011.
  • 5日本经済產業省原子力安全保安院.東北地方太平洋沖地震による福島第一原子力発電所の事故·トラブルに対するINES(国際原子力·放射線事象評価尺度)の適用について.
  • 6国家核安全局.HAF102核电厂设计安全规定[S]北京:国家核安全局,1991.
  • 7百度百科.风险控制.
  • 8日本内閣府原子力安全委員会.文部科学省緊急時迅速放射能影響予測ネツトワ一クシステム(SPEEDI)による計算結果.
  • 9日本政府原子力災害対策本部.原子力安全に関するIAEA閣僚会議に対する日本国政府の報告書-東京電力福島原子力発電所の事故について-.
  • 10日本朝日新聞社.図解東電福島第一原発事故と市民生活への影響.

共引文献119

同被引文献9

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部