期刊文献+

压水堆燃料组件研发中的力学问题 被引量:3

Mechanic Problems in PWR Fuel Assembly Research and Development
原文传递
导出
摘要 燃料组件弯曲变形可能导致装卸料困难、控制棒不能完全下插;燃料组件间的微动磨蚀可能会造成元件棒破损和核燃料泄漏,这些都直接影响核电厂的安全运行和经济性。针对压水堆燃料组件研发中的组件弯曲变形、组件微动磨蚀、组件结构完整性分析等几类典型力学问题的关键因素和解决办法进行了综述和展望。 Fuel assembly bowing may induce the reloading or unloading difficulties, and the incomplete insertion of control rod. The fretting between fuel assemblies could result in the component damage and the leakage of nuclear fuels. These phenomena directly affect the safe operation and economic benefits of nuclear power plants. This paper summarizes the typical mechanic problems, such as bowing, fretting, and integrality analysis in PWR fuel assembly research and development. The key factors, resolving methods and prospect are also proposed.
作者 李朋洲 李琦
出处 《核动力工程》 EI CAS CSCD 北大核心 2015年第5期136-139,共4页 Nuclear Power Engineering
关键词 压水堆燃料组件 力学问题 CF系列组件 PWR fuel assembly, Mechanic problems, CF series of fuel assembly
  • 相关文献

参考文献9

二级参考文献21

  • 1张伟丽,江春华,魏劲超.MySQL复制技术的研究及应用[J].计算机科学,2012,39(S3):168-170. 被引量:20
  • 2张翠凤.用摩擦学指导设备润滑工作[J].润滑与密封,1993,18(1):54-56. 被引量:1
  • 3IAEA-TECHNICAL REPORTS SERIES No388 Review of Fuel Failures in Water Cooled Reactors.
  • 4IAEA-TECDOC-1345.Fuel failure in water reactors: causes and mitigation.
  • 5IAEA-TECDOC-1050.Poolside inspection, repair and reconstitution of LWR fuel elements.
  • 6EJ/T1029-1996压水堆核电厂燃料系统设计限值规定.中国核工业总公司.1996.
  • 7EJ/T323-1998压水堆核电厂燃料组件设计准则.中国核工业总公司,1998.
  • 8燃料组件技术条件和图纸.上海核工程研究设计院,2003.
  • 9第四循环卸出燃料组件检查报告.秦山核电公司,1999.
  • 10破损燃料组件修复情况报告.秦山核电公司,1999.

共引文献38

同被引文献10

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部