摘要
综合考虑总体施工工期及现有的缆机使用强度,藏木水电站进水口拦污栅墩采取滑模施工方案。介绍了滑模结构设计及施工工艺,总结了施工过程中易出现的问题及处理措施,以供同类工程参考。
By considering the overall construction duration and the intensity of existing cable machine use, the pier of intake trash rack in Zangmu Hydropower Station is constructed by slipform technology. The design and structure of slipform are introduced and the problems and treatment measures during construction are summarized to provide references for other projects.
出处
《水力发电》
北大核心
2015年第11期75-77,86,共4页
Water Power
关键词
滑模
施工技术
藏木水电站
slipform
construction technology
Zangmu Hydropower Station