黄河天桥水电站除险加固后运行调度方式研究 被引量:1

Study on Operation Mode after the Reinforcement of Tianqiao Hydropower Station in Yellow River
下载PDF
导出
摘要 黄河天桥水电站除险加固后新增两孔泄洪闸和四孔排沙底孔,为保持水库的设计有效库容,充分发挥水电站的发电效益,对水电站运行调度方式进行了研究。通过实测资料分析,研究了天桥水电站排沙、排凌运用指标。通过数学模型计算,分析论证了不同方案下库区的冲刷和恢复库容效果,计算了不同方案下的发电量,提出了天桥水电站除险加固后运行调度方式。 Two sluice gates and four bottom holes for sediment discharging are newly built in the reinforcement of Tianqiao Hydropower Station. To keep the designed effective reservoir capacity and make full use of power generation potential, the operation mode of station after reinforcement is studied. Based on measured data, the operation index of sediment discharged and ice discharged are studied. After calculation by mathematical model, the effects of scouring and reservoir capacity recovery under different schemes are analyzed and demonstrated, and the power generations are also calculated. The operation mode of Tianqiao Hydropower Station after reinforcement is finally proposed.
出处 《水力发电》 北大核心 2015年第11期92-95,共4页 Water Power
关键词 运行调度方式 运用指标 库区冲淤 除险加固 天桥水电站 operation scheduling mode operation index reservoir erosion and deposition reinforcement Tianqiao Hydropower Station
  • 相关文献

参考文献6

二级参考文献5

  • 1潘瑞文,杨叔,徐一民.低坝底面流混合消能的试验研究[J].云南工学院学报,1994,10(2):41-46. 被引量:3
  • 2黄河天桥电站工程指挥部.黄河天桥水电站技术设计书[R].郑州:黄河水利勘测规划设计院,1977..
  • 3黄河水利委员会水科院.黄河天桥水电站运行期整体水工模型试验报告[R].郑州:黄河水利委员会水利科学研究院,1994..
  • 4华北水利水电学院.黄河天桥水电站除险加固工程水工模型试验报告[R].郑州:华北水利水电学院,2004..
  • 5勾兆莉,柴炳钦,李进敏.黄河天桥水电站面流消能问题探讨[J].人民黄河,1998,20(9):24-26. 被引量:1

共引文献8

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部