期刊文献+

PDCA循环在抗菌药物管理中的应用 被引量:8

The application of PDCA on antimicrobial management
下载PDF
导出
摘要 目的总结合理应用抗菌药物的管理方法。方法对医院2012年7月-2013年6月(PDCA循环前)及2013年7月-2014年6月(PDCA循环后)抗菌药物的应用情况进行分析。2013年7月-2014年6月按照PDCA循环管理法的计划、实施、检查、处理程序对抗菌药物应用进行管理和控制,利用统计学方法对PDCA循环管理前后用药指标进行回顾性对比分析。结果 PDCA循环管理后门诊、急诊、住院患者和I类切口抗菌药物使用率及抗菌药物药占比低于PDCA循环管理前,PDCA循环管理后各科室抗菌药物使用率均低于PDCA循环管理前,差异均有统计学意义(P<0.05)。结论运用PDCA循环管理方法能有效地促进抗菌药物的临床应用管理。 Objective To sum up the management methods of rational use of antimicrobial drugs. Methods Analysis the application of antibacterial drugs from July 2012 to June 2013,and July 2013 to June 2014. Conducted in accordance with PDCA cycle method planning,implementation,inspection,processing procedures,and management and control of antimicrobial drugs. Comparative the indicators before and after the PDCA management. Results The frequency of antibiotics use in outpatient,emergency,inpatient,class I cut were lower than that before PDCA management,the frequency of antibiotics use on various departments were lower than that before PDCA management,the difference was statistically significant( P〈0. 05). Conclusion PDCA management can promote the rational use of antibiotics.
作者 朱建祥
出处 《临床合理用药杂志》 2015年第28期1-3,共3页 Chinese Journal of Clinical Rational Drug Use
关键词 PDCA循环 抗菌药物 医院管理 PDCA cycle Antibacterials Hospital Management
  • 相关文献

参考文献10

二级参考文献52

共引文献146

同被引文献67

  • 1高磊,肖永红.颁布实施《抗菌药物临床应用指导原则》的背景与意义[J].中国医院,2004,8(8):7-9. 被引量:9
  • 2Jin H, Iquang H, Dong W, et al. Preliminary experience of a PD- CA-cycle and quality management based training curriculum for rat liver transplantation [J]. J Surg Res, 2012, 176(2): 409-422.
  • 3Mort K, Takebayashi T. The introduction of an occupational health management system for solving issues in occupational health activities in Japan [J Ind Health, 2002, 40:167-174.
  • 4Williams HF, Fallone S. CQI in the acute care setting: An opportunity to influence acute care practice [J Nephrol Nurs J, 2008, 35: 515-522.
  • 5Ersoy FF. Impivving technique survivial in peritoneal dialysis: What is modifiable? [Jl. Petit Dial Int, 2009, 29(2): $74-$77.
  • 6Chen M, Deng JH, Zhou FD, et al. Improving the manage- ment of anemia in hemodialysis patients by implementing the continuous quality improvement program [J Blood Pu- tif, 2006, 24(3): 282-286.
  • 7Torkki PM, Alho AI, Peltokorpi AV, et al. Managing urgent surgery as a process: Case study of a trauma center [J Int J Technol Assess Health Care, 2006, 22(2): 255-260.
  • 8Liu YH, Zhang LQ, Cheng K, et al. Application of PDCA cycle in the management of mechcal staff hand hygiene in community hospitals [J ACTA Med Mediterr, 2016, 32(1): 477-480.
  • 9Dye C, Surguy W. Utilizing the PDCA methodology to create change leads to an interdisciplinary approach to pressure ulcer prevention [J J Wound Ostomy Continence Nuts, 2013, 40: $28-$29.
  • 10Young YS, Lee OY, Bak YT, et al. Prevalence of gastro- esophageal reflux disease symptoms and uninvestigated dyspepsia in Korea: a population-based study [J Dig Dis Sci, 2008, 53(1): 188-193.

引证文献8

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部