某综合体建筑由4栋塔楼(带裙房)及地下室组成,为大底盘多塔结构。A区塔楼结构高度33.00m;B区塔楼结构高度48.90m;C区塔楼结构高度37.20m;D区塔楼结构高度29.40m。4栋塔楼采用框架结构体系。工程单塔带裙房模型为4栋单塔各自附带裙房以1层地面为嵌固端,单独建模计算,采用PKPM-SATWE软件建模及计算。
A comprehensive building which structure is many towers of large chassis was made up of 4 tower buildings(with the skirt room)and the basement. A tower structure height is 33.00 m, B tower structure height is38.90 m, C tower structure height is 37.2m and D tower structure height is 29.4m. 4 tower buildings adopt the structural system of the frame.The single tower with podium model building 4 single tower each attached to the podium with a layer of ground is embedded in the fixed end, separate modeling calculation with PKPM-SATWE software modeling and calculation
出处
《江苏建筑》
2015年第5期33-37,共5页
Jiangsu Construction
关键词
大底盘多塔
人工挖孔桩
周期
刚度
后浇带
many towers of large chassis
artificial dig hole pile construction
cycle
stiffness