双沟水电站引水系统布置及优化

Arrangement and Optimization of Headrace System,Shuanggou Hydropower Project
下载PDF
导出
摘要 介绍了双沟水电站引水系统建筑物的总体布置,引水系统布置充分考虑了地形、地质和交通条件,布局合理、安全经济、运行管理方便,并采取了多项设计优化措施,减少了工程量,加快了施工进度,节约了工程投资。取得经济效益和社会效益。 The general layout of the headrace system of Shuanggou Hydropower Project is described. The layout of the headrace system, with full consideration of topography, geology and access conditions, is rationally arranged. It is safety, economic and convenient for operation management. Furthermore, a couple of design optimizing measures are taken so that work quantity is reduced, construction is expedited and investment is decreased. Both economic and social benefits are achieved.
作者 陈立秋 王超
出处 《西北水电》 2015年第5期33-35,共3页 Northwest Hydropower
关键词 双沟水电站 进水口 引水隧洞 调压井 压力管道 Shuanggou Hydropower Project power intake headrace tunnel surge shaft penstock
  • 相关文献

参考文献5

  • 1双沟水电站枢纽工程竣工验收设计报告[R].长春.中水东北勘测设计研究有限责任公司,2013.
  • 2DL/T 5057-2009,水工混凝土结构设计规范[S].北京:中国电力出版社,2009.
  • 3DL/T 5195-2004,水工隧洞设计规范[S].北京:中国电力出版社,2004.
  • 4DL/T 5141-2001,水电站压力钢管设计规范[S].北京:中国电力出版社,2002.
  • 5DL/T 5058-1996,水电站调压室设计规范[S].北京:中国电力出版社,1997.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部