模糊综合评价法在EPC风电项目风险评价中的应用 被引量:9

Application of Fuzzy Comprehensive Assessment Method in Risk Assessment of Wind Energy Project Developed in EPC Mode
下载PDF
导出
摘要 针对总承包(EPC)风电项目可能存在的风险,提出了基于模糊综合评价理论的风险评价方法。在总结分析EPC风电项目各风险因素的基础上,结合案例分析将模糊综合评价法运用到风险评价研究中,根据模糊隶属度理论把定性评价转化为定量评价,从而实现对EPC风电项目的风险进行量化评价。 The risk assessment method based on the fuzzy comprehensive assessment theory is proposed aiming at potential risks in wind energy projects developed in EPC mode. Based on summary and analysis on potential risks in such wind project, the fuzzy comprehensive assessment method is applied in the risk assessment in combination with the case analysis. According to the fuzzy membership degree theory, the qualitative assessment is turned into quantitative assessment so that the risks of such wind energy projects could be assessed in term of quantitative assessment. It guides to strengthen the risk control and prevention.
出处 《西北水电》 2015年第5期86-89,共4页 Northwest Hydropower
关键词 风力发电 EPC模式 模糊综合评价 风险分析 wind power EPC mode fuzzy comprehensive assessment risk analysis
  • 相关文献

参考文献8

二级参考文献59

共引文献59

同被引文献56

引证文献9

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部