基于熵权改进的模糊综合方法对大型基础设施项目的风险评价——以温州轨道交通建设项目为例 被引量:9

Risk Evaluation of Large Infrastructure Projects Based on Entropy Fuzzy Comprehensive Method—A Case Study of Wenzhou Rail Transit Construction Projects
原文传递
导出
摘要 针对大型基础设施项目的风险评价问题,提出熵权改进后的模糊综合评价法。以温州轨道交通建设项目为实证,通过专家的评估调查数据计算,发现结果与其他评价方法的结果基本一致并且更合理,得出项目风险的排序结果,也表明该方法能有效完善大型基础设施项目的风险评价体系,可为构建我国大型公共投资项目复杂风险管理决策机制提供启示。 Aiming at the problems in risk evaluation of large infrastructure projects, the fuzzy comprehensive evaluation method with improved entropy is put forward. Taking Wenzhou rail transit construction project as an example, by calculating the data through experts' assessment, it is found that the results are basically consistent with those with other evaluation methods. It also shows that the proposed method can effectively improve the risk assessment system of large infrastructure projects, which can provide some inspiration for the construction of large public investment projects in China.
出处 《经济地理》 CSSCI 北大核心 2015年第10期44-49,共6页 Economic Geography
基金 国家社会科学基金重点项目(14AZD127)
关键词 风险评价 模糊综合评价 大型基础设施项目 温州 entropy fuzzy comprehensive evaluation risk assessment large infrastructure projects
  • 相关文献

二级参考文献130

共引文献256

同被引文献111

引证文献9

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部