摘要
建立了桥梁预防性养护三大目标预防性养护效果、养护成本、耐久性寿命延长综合集成控制的优化模型,解决了在最佳桥梁预防性养护时机实现最优养护成本的问题。
Established three objectives on preventive maintenance effect,maintenance costs,longer life durability of bridge preventive maintenance comprehensive integrated control optimization model,to solve the optimal maintenance costs in the best for maintenance timing bridge preventive issues.
出处
《山西建筑》
2015年第32期155-156,共2页
Shanxi Architecture
关键词
桥梁预防性养护
三大目标
集成控制
综合优化
bridge preventive maintenance
three objectives
integrated control
integrated optimization