摘要
对沉降观测法和灌水法试验结果进行比对分析,并通过工程实例碾压工艺试验,提出利用沉降观测法结合灌水法来控制土石混合料碾压填筑施工质量。试验结果表明:沉降观测法结合灌水法操作简单,结果真实可靠,应用效果良好,能够有效地控制施工质量,可供同类工程借鉴参考。
At present,conventional techniques that applied to test the earth compactness such as sand replacement method,cutting ring method and nucleon density instrument are not applicable to control the roller compaction quality of the earth- rock mixtures. In this article,comparison of settlement observation method to water replacement method is analyzed. Process test of roller compaction is carried out in the engineering. Then settlement observation method combined with water replacement method is presented to control the roller compaction quality of the earth- rock mixtures. The result shows that the settlement observation method combined with water replacement method is easy,true and reliable. It is available to control the construction quality and provide referring to the similar engineering.
出处
《广东水利水电》
2015年第7期52-55,共4页
Guangdong Water Resources and Hydropower
关键词
沉降观测法
宽粒径土石混合料
碾压
压实度
settlement observation
broad size distribution earth-rock mixtures
roller compaction
construction quality