文章介绍了方家山核电工程初步设计阶段对汽轮机房降标高设计方案的评审过程及关注要点。常规岛工程设计的好坏对于核电工程项目的影响巨大,应重视设计阶段的管理,增加设计审查的投入,特别是组织对设计方案的选择、论证、优化和评审。
This paper introduces the review process and related concerned points on the scheme of turbine building low elevation arrangement during basic design period, the quality of the conventional island engineering plays a very important role in the project engineering, the design management should be paid attention, and design review should be enhanced, especially the design scheme selection, verification and review should be organized.