福清核电站余热排出泵漩涡探测报警触发分析 被引量:1

The Analysis of Vortex Alarm Presence of Residual Heat Removal Pump
下载PDF
导出
摘要 文章介绍了福清核电站余热排出系统漩涡探测装置设置的目的以及报警触发后的动作,及当前设计上为避免泵入口出现漩涡已采取的措施;并结合福清核电机组在满足设计所需采取的措施的前提下触发该报警的现象,详细介绍了该报警触发的经过并结合机组当时的工况分析其原因及漩涡探测触发的机理;分析了该报警触发后所需的响应和可能产生的影响,并最终提出余热排出泵在运行时避免出现漩涡的解决办法。 The purpose of the vortex detector of residual heat removal pump and the actions after the alarm presence are introduced.Meanwhile,the measures to avoid vortex presence at the suction of the pump are described. Combined with the triggering of the alarm when the plant meeting with the measures requested by design. The process of triggering the alarm is described and the reasons are analyzed detailedly,while the mechanization of vortex detector is introduced. At last,the probable influence and requested responds are analyzed, along with the settlements to avoid vortex when the pumps operate normally.
作者 朱立新 颜勇
出处 《中国核电》 2015年第3期245-248,共4页 China Nuclear Power
关键词 漩涡探测 触发机理 解决办法 vortex detected mechanization settlements
  • 相关文献

参考文献3

  • 1刘建伟.余热排出系统系统手册第6.3章[G].中国核电工程有限公司,2009.
  • 2张中岳.余排运行异常或丧失事故规程[G].福建福清核电有限公司,2014.
  • 3梁青青.应急状态分级和应急行动水平[z].福建福清核电有限公司,2014.

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部