成品油库工程可行性研究报告编制中应注意的问题 被引量:3

Problems Which should be Paid Attention in the Feasibility Study Report about Finished Product Oil Depot Engineering
下载PDF
导出
摘要 目前,成品油库工程可行性研究报告编制中,部分可研存在资源与市场分析、库容规模、选址、平面布局、工艺流程等方面研究深度不够或内容欠缺等有关技术问题,对项目的科学决策及下步初步设计的开展影响较大。结合目前成品油库工程前期研究和建设情况,提出在成品油库工程可行性研究报告的编制中应注意的几个关键技术问题和改进对策,对提高成品油库工程可行性研究报告的编制水平和质量具有一定的指导和借鉴意义。 At present, the research depth and the research content of resources and market analysis, scale, site selection, plane layout and technological process are not perfect in the finished product oil depot project feasibility study report. This situation can make the great impact on scientific decision and the next design for the project. Based on the preliminary study and the construction situation of finished product oil depot project, some key technical issues and improving measures which should be paid attention are proposed in the paper. This has kind of guidance and reference to improving the level and quality of the finished product oil depot project feasibility study report.
作者 惠熙祥
出处 《石油规划设计》 2015年第6期36-38,53,共3页 Petroleum Planning & Engineering
  • 相关文献

参考文献3

  • 1中华人民共和国住房和城乡建设部.GB 50074-2014 石油库设计规范[S].北京: 中国计划出版社,2015.
  • 2中国石油集团工程设计有限责任公司华北分公司.中国石油贵州销售分公司贵阳久长油库新建工程初步设计[R].河北: 中国石油集团工程设计有限责任公司华北分公司,2012.
  • 3中国石油天然气集团公司.Q/SY 1190-2013 事故状态下水体污染的预防与控制技术要求[S].北京: 中国石油天然气集团公司,2013.

共引文献2

同被引文献23

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部