泰安抽水蓄能电站上库右岸面板水下检查及处理效果分析 被引量:2

Underwater inspection and treatment analysis on concrete face of right bank of upper reservoir at Tai'an pumped-storage power station
下载PDF
导出
摘要 泰安抽水蓄能电站上库右岸面板渗漏量呈增大趋势,并与进/出水口附近的面板垫层渗压水头正相关。水下检查发现进/出水口区域面板及结构缝破损,处理后渗漏量减小,运行一段时间后,渗漏量恢复处理前量值,处理未根治渗水问题,建议重新进行处理。 There was a growing trend of seepage at right bank concrete face of Tai'an pumped-storagepower station, which was positively correlated with the water head on the concrete face cushion zone.Damage was found at concrete face and the structure joints of water inlet/outlet during the underwater in-spection. The seepage dropped after treatment, but returned to the value before over time. The treatmentfailed to solve the problem. We strongly recommend taking further action.
出处 《大坝与安全》 2015年第4期62-65,共4页 Dam & Safety
关键词 泰安抽水蓄能电站 右岸面板 渗漏量 水下检查 处理效果 Tai'an pumped-storage power station right bank concrete face seepage underwater inspection treatment effect
  • 相关文献

参考文献1

  • 1李涛,吴伟,吕高峰,等.泰安抽水蓄能电站大坝安全首次定期检查材料[R].杭州:国家能源局大坝安全监察中心,2014.