地铁车站防火与维修通道设计冲突及解决

MRT Station Fire Compartment Design Requirement Clash with the Maintenance Access and Solution
下载PDF
导出
摘要 为了解决在前期施工过程中提前发现的地铁站中电话接线房、饮水泵房和防水泵房的防火设计与后期对相应设施的维修所存在的设计冲突,通过进行防火分区的研究以及结构受力计算和分析,在设计中采用了在电话接线房和防火房顶部增设顶板的方式来满足防火要求,此外还在饮水泵房设计中不设顶板从而满足后期对相应设施进行维修的要求。 On design stage MDF, Portable Water RM and Fire Pump RM have double slab in order to meet the fire compartment requirement of the said area but during construction we found out that this slabs are not possible because there is no access way for the services located above for future maintenance and it clashes with structural beam. In order to resolve this issue and meet the fire compartment requirement,we put double slab for MDF and Fire Pump Rm only and let the Potable Water Room open to serve as the access way for future maintenance. Meanwhile this issue have not affected the site work progress.
作者 王卉
出处 《交通节能与环保》 2015年第5期90-93,共4页 Transport Energy Conservation & Environmental Protection
关键词 防火分区 顶板 维修 fire compartment double Slab maintenance
  • 相关文献

参考文献6

  • 1BS 476, Fire Tests on Building Materials and Structures[S]. Britain: Britain Standard Institute, 2004.
  • 2ENV 1992-1-2 EuroCode 2: Design of Concrete Strnctures [S]. Britain: Britain Standard Institute, 1992.
  • 3GB50009--2012建筑结构荷载规范[s].北京:中国建筑工业出版社,2012.
  • 4BS 8111)-1, Code of Practice for Design and Construction [S]. Britain: Britain Standard Institute, 1997.
  • 5GB50010-2010钢筋混凝土结构设计规范[S].北京:中国建筑工业出版社.2010.
  • 6CP 65, Code of Practice for Structural Use of Concrete[S]. Singapore: Land Transport Authority, 2000.

共引文献231

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部