张福河船闸加固工程施工质量控制 被引量:2

Construction Quality Control of Zhangfu River Navigation Lock Strengthening Project
下载PDF
导出
摘要 船闸在使用中,受环境和各种工况的影响,经过一定周期的使用,往往需要采取加固措施。在确保安全前提下,针对张福河船闸除险加固工程的特殊性,明确质量方针目标,对关键部位混凝土质量控制,分析可能产生质量问题的原因,采取有效的控制措施,优化施工设计方案。从实施效果各项指标统计、分析表明,其达到甚至优于规范要求,取得了预期成效。 Navigation locks are affected by environment and all kinds of working conditions in use. After a certain period of use,they are often needed to be reinforced. Under the condition of safety and according to the particularity of Zhangfu River navigation lock strengthening project,the quality policy and aims were clarified,the concrete quality of key parts was controlled,the causes of quality problems were analyzed and effective measures were taken to optimize implementation plan. From statistics and analysis of all index of implementation effect,the project met or even excelled specification requirements and expected results were achieved.
出处 《淮阴工学院学报》 CAS 2015年第5期42-46,共5页 Journal of Huaiyin Institute of Technology
基金 江苏省住建厅科技项目(2014JH20) 淮安市科技项目(HAS2014021-2)
关键词 船闸加固 质量控制 管理方案 navigation lock strengthening quality control management plan
  • 相关文献

参考文献7

二级参考文献9

共引文献16

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部