摘要 随着当前我们国家的经济不断发展以及全球经济一体化程度不断提高,我们国家针对海外进行工程投资的程度也在不断上升。在最近这些年,因为国际经济金融环境的不断变化以及国际局势的风起云涌,国际的外汇市场也遇到了频频发生的突发性事件的干扰,这直接导致了我们国家自身货币的汇率经常出现大幅度的调整和波动。这也直接导致了我国的电力企业的海外电力投资项目在资金结算上经常出问题。其中,汇率风险已经成为海外电力工程建设中无法回避的一个问题。因此对于电力企业,如何针对汇率波动进行风险规避,并更进一步的对经营问题进行处理以避免亏损,就成为了我们必须面对的一个重大问题。 With the continuous development of economic in China and the continuous improvement of the global economic integration,the overseas engineering investment by China is rising. In recent years, international economic and financial environment is changing and the international situation is fluctuant. So, the international foreign exchange market is obstructed by the frequent occurrence sudden events.All of these directly lead to the currency of China often encounter significant adjustment and fluctuation. These also made the capital settlement of overseas power investment project of China's electric power enterprises have problems. Among them, the foreign exchange risk had become the problem unable to avoid in engineering construction of overseas power investment project. Therefore, how to carry out the risk aversion by foreign exchange rate fluctuations, and further deal with the business problems to avoid losses has become a major problem for electric power enterprises.
作者 辛将
出处 《价值工程》 2015年第33期52-54,共3页 Value Engineering
关键词 海外工程项目 投资 规避 汇率风险 overseas engineering project investment avoid foreign exchange risk
  • 相关文献

参考文献10

二级参考文献7

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部