摘要
兰州理工大学图书馆工程位于兰州市七里河区,建筑面积4.5万m^2。主体工程地上8层,建筑高度41.600m。本工程外墙装饰主要采用玻璃幕墙和干挂石材。外立面装饰面积共18000m^2。幕墙预埋铁件总数量22300块。本工程是兰州理工大学重点项目,其中幕墙预埋件安装质量直接影响到主体工程外装饰安装质量。但是由于预埋铁件数量多,因此对高精度安装造成很大问题,所以首先要解决这一问题。
The project of Lanzhou University of Technology library located in Qilihe District of Lanzhou.The construction area is 45000 square meters.On the ground of the main project is 8,building height is 41.600 M.The main project on the ground is 8floor,building height is 41.600 M.Exterior wall decoration mainly adopts glass curtain wall and dry hanging stone.Facade decoration area of 18000 square meters.The numbers of embedded iron in curtain wall are 22300 pieces.This project is the key project of Lanzhou University of Technology.The curtain wall installation of embedded parts directly affects the quality of the main project decoration installation quality.However,because there are many pre embedded iron parts,the high accuracy of the installation is a big problem,so the first thing to solve this problem.
出处
《中国建材科技》
2015年第5期103-104,共2页
China Building Materials Science & Technology
关键词
工程
幕墙
预埋铁件
合格率
project
curtain wall
pre embedded iron parts
acceptance rate