期刊文献+

挖掘机销轴的断裂失效分析 被引量:5

Analysis of A Pin of Excavator Failure
下载PDF
导出
摘要 挖掘机的销轴在工作过程中发生断裂。本文通过对断裂销轴的宏观断口、微观形貌、显微组织、化学成分、材料硬度及销轴的受力等分析,结果表明,销轴断裂为典型的疲劳断裂。疲劳源位于油孔处,属油孔部位应力集中造成的。因此,油孔位置设计不合理是销轴断裂的主要原因。另外,疲劳源始于油孔内的切削刀痕,切削刀痕也是销轴断裂的原因之一。结合以上分析,本文提出了解决问题的方法,优化了工艺路线方案,为提高销轴的使用寿命指明了方向。 Pin of excavator breakage occurs during operation, through the macroscopic observation and analysis to the fracture, metallurgical structure analysis under microscope, Microscopic analysis of the electron microscope, chemical composition analysis, hardness testing analysis. Mechanical Performance Analysis and so on .The results show that the fracture of the pin is typical brittle Fatigue fracture and belongs to early failure.pin caused stress concentration at the hole and ,fatigue crack initiation a and propagation at the hole located.The position of the hole design unsuitable is one of the reasons pin breakages. leaving traces of the existence of lane geometry gap after turning when turning hole chamfering.Notched fatigue and the gap causing stress concentration is also one of the reasons that pin fractures.Finally, given above the problems identified find solutions to problems and further optimize the process route programs to improve the life of the pin.
出处 《现代制造技术与装备》 2015年第5期72-74,共3页 Modern Manufacturing Technology and Equipment
关键词 挖掘机 销轴 油孔 疲劳失效 excavator pin oil hole fatigue fracture
  • 相关文献

参考文献2

二级参考文献17

共引文献18

同被引文献40

  • 1王萌,杨维国.薄钢板剪力墙结构滞回行为研究[J].建筑结构学报,2015,36(1):68-77. 被引量:27
  • 2丁大益,潘斌,王元清,等.钢结构工程中销轴连接的应用和研究[J].工业建筑,2011(增刊):680—685.
  • 3YAVARI V, RAJABI I, DANESHVAR F, et al. On the stress distribution around the hole in mechanically fastened joints E J ]. Mechanics research communications, 2009,36 ( 3 ) : 373 - 380.
  • 4GRANT R J, FLIPO B C D. Parametric study of the elastic stress distribution in pin-loaded lugs modelled in two and three dimensions and loaded in tensionE J]. Journal of strain analysis for engineering design, 2009,44 ( 6 ) : 473 - 489.
  • 5STROZZI A, BALDINI A, GIACOPINI M, et al. Maximum equivalent stress in a pin-load- ed lug in the presence of initial clearance J ]. Journal of strain analysis for engineering de- sign,2011,46(8) :760 -771.
  • 6GRANT R J, THIENPONT E, ALLARD L J. A parametric study of the elastic stress distribu- tion in a pin-loaded tube with multiple pinning J]. Engineering structures, 2015,103 : 102 - 115.
  • 7AHN Y J, BARBER J R. Response of frictional receding contact problems to cyclic loading E J ]. International journal of mechanical sci-ences,2008,50 ( 10 - 11 ) :1519 - 1525.
  • 8FLICEK R C, MOORE K J, CASTELLUCCIO G M, et al. Stress waves propagating through bolted joints [ M ]. Germany : Springer, 2016.
  • 9JUNG K,LEE S,PARK Y C,et al. Finite ele- ment analysis study on the thermomechanical stability of thermal compression bonding (TCB) joints in tubular sodium sulfur cells I J ]. Journal of power sources, 2014,250 ( 9 ) : 1 -14.
  • 10AHMADI H, GHAFFARI A, AHMADI H, et al. Probabilistic analysis of stress intensity factor ( SIF ) and degree of bending ( DoB ) in axially loaded tubular K-joints of offshore structures[ J]. Latin American journal of solids & structures, 2015,12 ( 11 ) : 2025 - 2044.

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部