摘要
采用以设计阶段为控制重点的项目全过程投资控制方法,将项目费用控制在限额内,并随时纠正发生的偏差,以保证投资估算、设计概预算和竣工决算等管理目标的实现,达到合理使用人力、物力、财力,获得最大投资效益的目的。
Adopt a design stage to control the whole process of investment projects focusing control method, the project cost control within the limits and at any time to correct the error occurred, in order to ensure investment estimation, design and implementation of budget estimate and completion of final accounts and other management objectives, to achieve a reasonable use human, material and financial resources, maximum investment benefits.
出处
《现代制造技术与装备》
2015年第5期179-179,182,共2页
Modern Manufacturing Technology and Equipment
关键词
设计阶段
全过程控制
投资控制
最大投资效益
the design phase
the whole process of control
investment control
the maximum investment returns