七里坝水库除险加固拱坝应力分析 被引量:4

Stress analysis of risk removal reinforcement arch dam in Qiliba Reservoir
下载PDF
导出
摘要 七里坝水库处于高山峡谷地区,为运行多年的病险水库,拱坝为下游面加厚的单曲拱坝,坝体存在横向裂缝和水平裂缝,本文通过对拱坝应力进行对比分析研究,提出了拱型重力坝加固处理方案,得出了除险加固后拱坝稳定安全的结论,运行结果表明,大坝稳定、运行安全。 Qiliba Reservoir is located in mountain valley area,which has been operated for many years and belongs to dangerous reservoir.The arch dam belongs to thickened single arch dam on the downstream face.The dam body have transverse cracks and horizontal cracks.In the paper,arch dam stress is comparatively analyzed and studied.The reinforcement treatment plan of arch gravity dam is proposed.The conclusion of stable and safe arch dam after risk removal and reinforcement is obtained,and the operation results show that the dam is stable with safe operation.
作者 李太军
出处 《中国水能及电气化》 2015年第10期44-48,5,共6页 China Water Power & Electrification
关键词 七星里水库 拱坝 应力分析 Qixingli Reservoir arch dam stress analysis
  • 相关文献

参考文献3

  • 1sL25_2006砌石坝设计规范[S].北京:中国水利水电出版社,2006.
  • 2SL319-2005混凝土重力坝设计规范[s].北京:中国水利水电出版社,2005.
  • 3遵义市水利水电勘测设计研究院.七里坝水库大坝裂缝应急处理方案[R].遵义:2004.

共引文献19

同被引文献33

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部