期刊文献+

基于现代中小型制造企业的订单评审体系研究

Research on the Order Review System Based on Modern Small and Medium-sized Manufacturing Enterprises
下载PDF
导出
摘要 通过对订单评审进行系统的研究,重点针对中小制造企业订单评审中存在的问题进行分析,对订单评审的内容、方式和流程等进行梳理与总结。从专业性和可操作性的角度出发,构建了科学合理的订单评审指标体系,为中小制造型企业订单评审的有效运作提供了工作思路和操作方法。 Based on the research of the order review system, the existing problems in order review in small and medium-sized manufacturing enterprises was analyzed. The contents, methods and process of the order review were described and summarized. From the point of view of expertise and operability, a scientific and reasonable order review index system has been established, which provides a new working ideas and operation method for the effective operation of the order review in small and medium-sized manufacturing enterprises.
作者 董鹏
出处 《铝加工》 CAS 2015年第5期59-64,共6页 Aluminium Fabrication
关键词 订单评审 指标体系 中小制造企业 评审流程 order review index system small and medium-sized manufacturing enterprises review process
  • 相关文献

参考文献5

二级参考文献23

  • 1陈杰,张力菠.供应链环境中交货期问题的研究[J].中国制造业信息化(学术版),2005,34(4):105-107. 被引量:6
  • 2丁进,唐任仲.基于工作流的敏捷询单处理系统[J].制造业自动化,2006,28(7):4-6. 被引量:2
  • 3刘文富,祝勇,潘晓弘.快速响应客户需求的敏捷询单模型研究[J].轻工机械,2006,24(3):163-166. 被引量:4
  • 4张志清,杨中华.基于AHP和NEULONET的供应商选择问题[J].系统工程与电子技术,2007,29(4):570-573. 被引量:14
  • 5Wu Chong,David Barnes,Duska Rosenberg,et al.An ana-lytic network process-mixed integer multi-objective program-ming model for partner selection in agile supply chains[J].Production Planning&Control,2009,20(3):254-275.
  • 6Ren J,Yusuf Y Y,Burns N D.A decision-support frameworkfor agile enterprise partnering[J].International Journal ofAdvanced Manufacturing Technology,2009,41(1-2):180-192.
  • 7Kudret Demirli,Alebachew D YIMER.Fuzzy scheduling of abuild-to-order supply chain[J].International Journal of Pro-duction Research,2008,46(14):3931-3958.
  • 8Ebadian M,Rabbani M,Torabi S A,et al.Hierarchicalproduction planning and scheduling in make-to-order environ-ments:reaching short and reliable delivery dates[J].Inter-national Journal of Production Research,2009,47(20):5761-5789.
  • 9CHEN Zhi-Long,Guruprasad Pundoor.Integrated orderscheduling and packing[J].Production and OperationsManagement,2009,18(6):672-692.
  • 10Bhagwat R,Sharma M K.Performance measurement of sup-ply chain management using the analytical hierarchy process[J].Production Planning&Control,2007,18(8):666-680.

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部