摘要 为安全通过郝家梁矿副斜井塌方段,制定切实可行的塌方处理方案显得尤其关键。根据该井筒的工程地质条件与水文地质条件,分析了塌方原因,制定了通过塌方段的注浆处理方案,确定了迎头工作面管棚超前支护方案与壁后注浆充填方案的详细参数,按此方案实施后,顺利通过塌方段,保证了矿井的正常施工。 In order to safely get through the collapsed section of auxiliary inclined shaft of Haojialiang Mine, a practical and feasible collapse treatment scheme is needed. Based on the engineering geological and hydrogeological conditions of the shaft, the cause of collapse is analyzed, the grouting treatment scheme covering the collapsed section is proposed. The detailed parameters about the heading workface pipe-shed advance support scheme and behind-wall grouting scheme are determined. The collapsed section is successfully construction process of shaft is ensured. passed by the application of this scheme. Smooth
作者 黄宝龙
出处 《黄金》 CAS 2015年第11期37-40,共4页 Gold
关键词 黄土 斜井 塌方 管棚注浆超前支护 壁后注浆 loess inclined shaft collapse pipe-shed grouting advance support behind-wall grouting
  • 相关文献

参考文献7

二级参考文献23

共引文献18

同被引文献13

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部