一次高空气象观测应急处理过程分析 被引量:1

Analysis on treatment process of a upper air meteorological observation emergency
下载PDF
导出
摘要 通过对南宁高空站近期发生的一次L波段雷达系统软件基测开关失灵从而启用探空数据备份接收机进行应急观测的过程分析,指出相关处理结果存在的一系列弊病:迟测、大量测风记录缺测和报文数据传输逾限,由此得出:建立正确的应急观测工作思路,合理安排各种观测保障活动的先后次序和轻重缓急,是有效应对各种复杂观测过程、获取最佳气象观测结果的关键。 Based on analysis of a process recently happened in aerological station in Nanning of the failure of testing switch of L-band radar system software making use the sounding data backup receiver for emergency observation, a series of defects caused by this dealing process were pointed out, like: late testing, a large number of wind records missing and the over-due transmission of data. Overall, the conclusion is that establishing the correct emergency observation work ideas, reasonably arranging the sequence and priorities of various observation guarantees are keys to effectively cope with all kinds of complicated observation process and obtain the best meteorological observations results.
出处 《气象研究与应用》 2015年第3期80-82,共3页 Journal of Meteorological Research and Application
关键词 L波段雷达 探空数据 备份接收机 应急观测 记录对接 L-band radar sounding data sounding data emergency observation record docking
  • 相关文献

参考文献14

二级参考文献68

共引文献142

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部