摘要
通过对三种不同工艺方法进行充型凝固模拟分析、研究,结合现场生产验证,得出主轴承盖类产品最佳生产方案。
The filling and solidification process of three process were simulated. Combined with on-site production,an optimal production program for main bearing cap casting was put forward in this paper.
出处
《铸造设备与工艺》
2015年第5期23-25,共3页
Foundry Equipment & Technology
关键词
主轴承盖
模数
顺序凝固
工艺方案
main bearing cap
modulus
progressive solidification
process program