某600MW机组湿法脱硫除雾器改造分析

Analysis on reformation of wet desulphurization demister of a 600 MW unit
下载PDF
导出
摘要 为解决某电厂600 MW机组湿法烟气脱硫系统经常出现的除雾器堵塞和失效问题,将两层平板式除雾器改造为一级管式加两级屋顶式除雾器,并详细介绍了改造方案、施工工期、工程造价和试验效果,改造后有效减少了吸收塔出口烟气的液滴含量,保证了机组和脱硫系统的安全运行。 In order to solve the blocking and failure problems of the demister of wet flue gas desulfurization system of a 600 MW units,the two-layer flat plate type demister was reformed into one-stage tubular plus two-stage roof type demister. The reformation scheme,the construction period,the project cost and the test result were introduced in detail. After the reformation,the liquid drop content of the flue gas in absorption tower outlet was reduced effectively,and safe operation of the unit and desulphurization system was ensured.
作者 聂鹏飞
出处 《华电技术》 CAS 2015年第8期70-71,79,共2页 HUADIAN TECHNOLOGY
关键词 600 MW机组 湿法烟气脱硫 除雾器 改造分析 600 MW unit wet flue gas desulphurization demister analysis on reformation
  • 相关文献

参考文献5

二级参考文献27

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部