期刊文献+

重大工程关键部件供应商合作机制研究 被引量:2

Research on Cooperation Mechanism between Key Components Suppliers in Mega Project
下载PDF
导出
摘要 针对重大工程关键部件供应商的合作问题,基于演化视角建立供应商的合作博弈模型,分析双方合作的影响因素,并进一步构建业主参与下的激励与惩罚机制,对其影响因素进行探讨。研究结果表明,合作生产的超额收益与不合作时支付的租金的增加对双方合作有促进作用,合作投资成本与"搭便车"收益的增加则不利于博弈双方走向合作,投资成本的合理分担与业主参与下有效的激励和惩罚机制可以降低"搭便车"行为的产生,促进供应商间的合作。 By the evolutionary game theory,this paper researched on the cooperation mechanism between key components suppliers in mega project,and analyzed the influence factors of bilateral cooperation,and then studied the impact of the incentive and punishment mechanism when the owner participated in. Result showed that,the probability of cooperation of both sides had a positive correlation with excess income of cooperation and the rent paid when non-collaboration,and a negative correlation with cost of investment and extra income obtained by free-rider behavior. Reasonable sharing of investment cost and the incentive and punishment mechanism can control the free-rider behavior and promote the cooperation between suppliers.
出处 《软科学》 CSSCI 北大核心 2015年第11期124-129,共6页 Soft Science
基金 国家自然科学基金重大项目(71390520) 国家自然科学基金项目(71271107 71301062 71201073) "十一五"国家科技支撑计划项目(2011BAG07B00) 江苏省研究生培养创新工程项目(KYZZ15_0023 KYLX15_0031)
关键词 重大工程 关键部件 有限理性 合作机制 mega project key component bounded rationality cooperation mechanism
  • 相关文献

参考文献15

  • 1盛昭瀚.关于我国重大工程管理若干问题研究[R].镇江:国家自然科学基金委员会第79期双清论坛,2012.
  • 2Richard R B. Industrialised Building Systems: Reproduction before Automation and Robotics [ J ]. Automation in Construction, 2005, 14(4) : 442 -451.
  • 3Khalili A, Chua D. Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Produc- tion [ J ]. Journal of Construction Engineering and Management, 2014, 140(2). 04013052.
  • 4Zhang Y, Flood I. Planning and Scheduling Prefabrication Construc- tion Projects Using Dependency Structure Matrix[ J]. Computing in Civil and Building Engineering, 2014:1457 -1464.
  • 5孙利辉,崔文田.创新联盟的一对一动态形成机理研究[J].计算机集成制造系统,2004,10(10):1296-1300. 被引量:7
  • 6王红卫,马新安,费奇.大型工程物资供应组织中的合作伙伴选择[J].计算机集成制造系统-CIMS,2001,7(7):47-52. 被引量:5
  • 7Akintoye A, Mclntosh G, Fitzgerald E. A Survey of Supply Chain Collaboration and Management in the UK Construction Industry[ J]. European Journal of Purchasing & Supply Management, 2000, 6 (3) :159 -168.
  • 8Saad M, Jones M, James P. A Review of the Progress towards the Adoption of Supply Chain Management ( SCM ) Relationships in Construction [ J ]. European Journal of Purchasing & Supply Man- agement, 2002, 8(3):173-183.
  • 9宋波,黄静.非对称性合作视角下战略联盟的稳定性分析——基于鹰鸽博弈模型[J].软科学,2013,27(2):28-31. 被引量:12
  • 10陈洪转,方志耕,刘思峰,何利芳.复杂产品主制造商-供应商协同合作最优成本分担激励研究[J].中国管理科学,2014,22(9):98-105. 被引量:31

二级参考文献67

共引文献65

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部