摘要
红枫水电站是贵州猫跳河流域的龙头电站,也是我国国内唯一一座采用木斜墙防渗的堆石坝,至今正常运行50余年。红枫大坝于1989年进行防渗结构改造,本文通过对改造后的渗压观测数据进行分析,初步得出红枫大坝防渗结构改建后的运行效果。
Hongfeng Dam is the leading hydropower station in Guizhou Maotiaohe valley,is also the only impervious structure used wood sloping wall in rockfill dam in our country and running so far more than 50 years.The impervious structure of Hongfeng dam has been reformed in 1989,This paper will analyzes the uplift pressure monitoring data recorded after reformed and reach the running results.
出处
《电力勘测设计》
2015年第5期69-74,共6页
Electric Power Survey & Design
关键词
红枫大坝
防渗结构
浸润线
扬压力.
Hongfeng dam
impervious structure
saturation line
uplift pressure.