对回填土常用的地基处理方法及优缺点进行了简要阐述,结合某燃煤发电厂工程的水文地质条件,采用组合式地基处理方法进行高回填区地基处理,并论述了具体的施工要点,为类似工程提供了参考依据。
The paper illustrates the common basement treatments and their advantages and disadvantages in the refilled soil,combined with the hydrogeological conditions of a coal fired power plant,adopts the composite foundation treatment to undertake the basement treatment at the highly-filled areas,and indicates its construction points,so as to provide some ideas for similar projects.