摘要
以永川长江大桥为例,对该大桥钢—混结合段的施工难点进行了研究,从钢梁存梁支架、桥面吊机、钢箱梁定位等方面论述了钢—混结合段施工的关键技术,为类似工程的施工积累了经验。
Taking Yangze river bridge in Yongchuan as an example,the paper studies its bridge steel-concrete combined section construction difficulties,and discusses critical steel-concrete combined section construction techniques from aspects of steel-beam bracket,deck hoister and steel box girder orientation,which has accumulated construction experience for similar engineering.
出处
《山西建筑》
2015年第33期165-167,共3页
Shanxi Architecture
基金
"十二五"国家科技支撑计划课题"钢-混凝土组合结构现代化施工关键技术研究四"(课题编号:2011BAJ09B0404)
关键词
斜拉桥
钢—混结合段
钢箱梁
桥面吊机
cable-stayed bridge
steel-concrete combined section
steel-box girder
deck hoister