摘要
结合工程实例,介绍了现浇箱梁满堂式支架搭设的设计参数及编制依据,探讨了满堂式支架搭设中的基础处理方案,并对荷载的计算过程进行了阐述,同时研究了支架配置的具体措施,以保证支架的稳定性和梁体的质量。
Combining with the engineering example,this paper introduced the design parameters and compilation basis of cast-in-situ box girder full timbering erection,discussed the foundation treatment scheme in full timbering erection,and elaborated the load calculation process,researched the specific measures of timbering configuration,to ensure the stability of timbering and the quality of beam body.
出处
《山西建筑》
2015年第33期175-178,共4页
Shanxi Architecture
关键词
现浇箱梁
满堂式支架
剪刀撑
荷载计算
cast-in-situ box girder
full timbering
double bridging
load calculation