Optimal operation of energy at hydrothermal power plants by simultaneous minimization of pollution and costs using improved ABC algorithm

Optimal operation of energy at hydrothermal power plants by simultaneous minimization of pollution and costs using improved ABC algorithm
原文传递
导出
摘要 The aim of this paper is simultaneous mini- mization of hydrothermal units to reach the best solution by employing an improved artificial bee colony (ABC) algorithm in a multi-objective function consisting of economic dispatch (ED) considering the valve-point effect and pollution function in power systems in view of the hot water of the hydro system. In this type of optimization problem, all practical constraints of units were taken into account as much as possible in order to comply with the reality. These constraints include the maximum and minimum output power of units, the constraints caused by the balance between supply and demand, the impact of pollution, water balance, uneven production curve con- sidering the valve-point effect and system losses. The proposed algorithm is applied on the studied system, and the obtained results indifferent operating conditions are analyzed. To investigate in various operating conditions, different load profiles in 12 h are taken into account. The obtained results are compared with those of the other methods including the genetfc algorithm (GA), the Basu technique, and the improved genetic algorithm. Fast convergence is one of this improved algorithm features. The aim of this paper is simultaneous mini- mization of hydrothermal units to reach the best solution by employing an improved artificial bee colony (ABC) algorithm in a multi-objective function consisting of economic dispatch (ED) considering the valve-point effect and pollution function in power systems in view of the hot water of the hydro system. In this type of optimization problem, all practical constraints of units were taken into account as much as possible in order to comply with the reality. These constraints include the maximum and minimum output power of units, the constraints caused by the balance between supply and demand, the impact of pollution, water balance, uneven production curve con- sidering the valve-point effect and system losses. The proposed algorithm is applied on the studied system, and the obtained results indifferent operating conditions are analyzed. To investigate in various operating conditions, different load profiles in 12 h are taken into account. The obtained results are compared with those of the other methods including the genetfc algorithm (GA), the Basu technique, and the improved genetic algorithm. Fast convergence is one of this improved algorithm features.
出处 《Frontiers in Energy》 SCIE CSCD 2015年第4期426-432,共7页 能源前沿(英文版)
关键词 practical constraints of units pollution func-tion inlet steam valve up-ramp rate of units improvedABC algorithm practical constraints of units, pollution func-tion, inlet steam valve, up-ramp rate of units, improvedABC algorithm
  • 相关文献

参考文献1

二级参考文献35

  • 1El-Saadany E F, Zeineldin H H, Al-Badi A H. Distributed generation: benefits and challenges. In: International Conference on Communication, Computer & Power, 2007, 115-119.
  • 2Algarni A. Operational and planning aspects of distribution systems in deregulated electricity markets. Dissertation for the Doctoral Degree. Waterloo: University of Waterloo, 2009.
  • 3Zeineldin H H, EI-Saadany E F, Salama M M A. Islanding detection of inverter based distributed generation. IEE Proceedings-Genera- tion, Transmission and Distribution, 2006, 153(6): 644-652.
  • 4Eltawil M A, Zhao Z. Grid-connected photovoltaic power systems: Technical and potential problems-a review. Renewable & Sustainable Energy Reviews, 2010, 14(1): 112-129.
  • 5Congressional Budget Office. Congress of the U.S. Prospects for distributed electricity generation. 2003-09, http://www.cbo.gov/ showdoc.cfrn?index = 4552andsequence = 2.
  • 6Zeineldin H H, E1-Saadany E F, Salama M M A. Impact of DG interface control on islanding detection and non-detection zones. IEEE Transactions on Power Delivery, 2006, 21(3): 1515 :1523.
  • 7Standards Coordinating Committee 21. IEEE Standard 1547TM. IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems. New York: the Institute of Electrical and Electronics Engineers, 2003.
  • 8Hernandez-Gonzalez G, Iravani R. Current injection for active islanding detection of electronically-interfaced distributed resources. IEEE Transactions on Power Delivery, 2006, 21(3): 1698-1705.
  • 9Karimi H, Yazdani A, Iravani R. Negative-sequence current injection for fast islanding detection of a distributed resource unit. IEEE Transactions on Power Electronics, 2008, 23(1): 298-307.
  • 10Ropp M E, Begovic M, Rohatgi A. Analysis and performance assessment of the active frequency drift method of islanding prevention. IEEE Transactions on Energy Conversion, 1999, 14(3): 810-816.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部