摘要 盾构隧道难免会下穿既有构筑物。以新建某地地铁2号线区间双线盾构隧道下穿既有地铁1号线区间隧道为例,通过运用ANSYS有限元分析软件对土体注浆和未注浆情况下盾构施工进行模拟,得出土体在注浆的情况下既有结构的变形明显减小。最后将ANSYS计算结果与监测结果进行比较,两者相差不大,验证了模拟计算结果的正确性,为今后盾构隧道下穿既有结构的施工提供了借鉴和参考。 It is very common that the subway shield tunnelwill cross under the existing structures. Based on a double shield tunnel of subway Line 2 in a city that crosses under the existing tunnel section of Line 1 ,ANSYS finite element analysis is used to simulate the construction process with and without the soil grouting reinforcement respectively, the result shows that the deformation of existing structure is obviously reduced with the soil grouting reinforcement. Then, the ANSYS calculation value is compared with the monitoring result in the condition of grouting reinforcement, no great difference between them is observed. Thus, the reliability of the finite element analysis is verified, which providesa reference for the future construction project of shield tunnel crossing the existing structures.
作者 詹涛
出处 《城市轨道交通研究》 北大核心 2015年第11期23-29,共7页 Urban Mass Transit
关键词 地铁 盾构隧道 下穿既有隧道 结构变形 有限元分析 注浆加固 subway shield tunnel crossing under existing tunnel structure deformation finite element analysis grouting reinforcement
  • 相关文献

参考文献11

二级参考文献61

共引文献579

同被引文献53

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部