摘要
城市轨道交通设备工程建设各个阶段管理界面的目标进度及其权责的交接,是工程建设中非常突出的问题。通过设备建设工程中安装调试阶段管理界面的探讨,提出设备工程的管理界面和管控五要素,借此以规范、控制和管理设备工程交接,使工程建设领导者、组织者和参与者,在全线工程建设初期,就组织力量对设备工程建设各个阶段及其管控五要素进行策划,并制定详细、科学合理、可行的实施方案,以规范每个参与者的工程行为。
In the management interface of urban rail transit equipment engineering construction at different stages, the handover of the progress, objectives and the responsibilitiesis a very serious problem. Through a discussion on the management interface of equipment installation and debugging, the management interface, the five elementsin management and control are put forward, which will be used to regulate,control and manage the transfer of equipment engi- neering, reminding the projectsupervisors, organizers and participants from the very beginning , to organize forces for the planning at various stages of equipment construction based on the five elements of management and control, and to develop a detailed, scientific andfeasible implementation plan to regulate the behaviors of each project participant.
出处
《城市轨道交通研究》
北大核心
2015年第11期73-79,共7页
Urban Mass Transit
关键词
城市轨道交通
设备安装
建设阶段
管理界面
管控模式
urban rail transit
equipment installation
construction stage
management interface
Control mode