期刊文献+

基于多功能车辆总线的网络系统冗余设计 被引量:4

Redundancy Design Method of Network System Based on Multifunction Vehicle Bus
下载PDF
导出
摘要 针对多功能车辆总线网络系统的可靠性问题,采用二模热冗余方法进行多功能车辆总线(MVB)网络冗余环型设计,并提出相应的介质冗余协议;对多功能车辆总线冗余环型网络的可靠性进行理论分析,并基于OMNeT++仿真平台建立多功能车辆总线冗余环型模型,对介质冗余协议进行仿真测试.测试结果表明,当多功能车辆总线网络系统出现故障时,介质冗余协议能实时可靠地进行总线替换,有效提高了多功能车辆总线网络系统的可靠性. In order to improve the reliability of the multifunction vehicle bus(MVB)network system,a method of two-mode hot redundancy was adopted to design a model of redundancy ring network for MVB,and proposed a corresponding media redundancy protocol MRPM.To analyze the reliability of MVB redundant ring network,OMNeT++ simulation platform was used to establish the model of MVB redundancy ring network.The results show that when the MVB redundant ring network fails,the MRPM can switch to the monitor bus in reliable and real-time,making the rebliability of the MVB network system improved effectively.
出处 《吉林大学学报(理学版)》 CAS CSCD 北大核心 2015年第6期1257-1262,共6页 Journal of Jilin University:Science Edition
基金 吉林省科技厅科技攻关计划项目(批准号:20140204037GX) 吉林省发展与改革委员会经济结构战略调整引导专项基金(批准号:2014Y125)
关键词 多功能车辆总线 冗余 介质冗余协议 可靠性 multifunction vehicle bus(MVB) redundancy media redundancy protocol reliability
  • 相关文献

参考文献8

二级参考文献35

  • 1李常贤,吴健,宁寿辉.分布式MVB通讯控制模块[J].内燃机车,2005(3):19-21. 被引量:4
  • 2张元林.列车控制网络技术的现状与发展趋势[J].电力机车与城轨车辆,2006,29(4):1-4. 被引量:36
  • 3International Eleetrotechnical Commission (IEC). Electric railway equipment-Train bus-Part 1: Train Communication Network IEC61375-1[S]. 1999.
  • 4Moreno J C, Laloya E J, Navarro J. A link-layer slave device design of the MVB-TCN Bus (IEC 61375 and IEEE 1473-T) [J]. IEEE Transaction on Vehicular Technology, 2007, 56 (6) : 3457--3468.
  • 5Kirrmann H, Zuber P A. The IEC/IEEE train communication Network [J]. IEEEMicro, 2001, 21 (2): 81--92.
  • 6YUAN Li, MENG Xian-yun. Reliability Analysis of a Warm Standby Repairable System with Priority in Use [ J ]. Applied Mathematical Modeling, 2011, 35: 4295-4303.
  • 7Dhillon B S, Anude O C. Common-Cause Failure Analysis of a Parallel System with Warm Standby [ J ].Microelectronics Reliability, 1993, 33 (9) : 1321-1342.
  • 8Dhillon B S. A 4-Unit Redundant System with Common-Cause Failures [ J]. IEEE Transactions on Reliability, 1977, 26(5) : 373-374.
  • 9Gupur G, ZHU Guang-tian, LI Xue-zhi. Existence and Uniqueness of Nonnegative Solution of M/GB/1 Queueing Model [J]. Comput Math Appl, 2000, 39(7/8) : 199-209.
  • 10Dunford N, Schwartz J T. Linear Operators, Part I [ M]. New York: Wiley, 1958.

共引文献25

同被引文献37

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部