东山水闸下游消能工出险初步分析和度汛研究 被引量:1

Preliminary Analysis and Study on Downstream Energy Dissipation Damage of Dongshan Sluice in Flood Season
下载PDF
导出
摘要 东山水闸于2013年汛期前期泄洪造成部分闸孔下游消能工遭受破坏,在出险闸孔下游消能工初步修复之后,水闸面临汛期度汛的问题。在水闸下游消能工出险原因初步分析的基础上,通过对枢纽电站运行的闸下游水位的分析和水闸下游消力池运行水力条件的计算,提出了水闸各类闸孔和闸门开度合理调度运行的度汛方案,得到了水闸调度运行的采用。研究成果可供类似工程运行参考。 The downstream energy dissipation of some gate holes of Dongshan sluice was damaged in 2013 due to pre-flood discharge in the flood season.After preliminary reparation of the downstream energy dissipation,it faced the problem of how to go through the flood season.On the basis of initial analysis of the causes of damage,and after analysis on the downstream water level during operation of the power station and calculation of the hydraulic conditions of the stilling basin,flood prevention scheme on reasonable dispatching and operation of all kinds of gate holes and gate openings is put forward,and used on the application of gate dispatching and operation.The research results can be used as reference for similar projects.
作者 黄智敏
出处 《水利水电工程设计》 2015年第4期48-50,56,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 水闸 消能工 出险 汛期 运行 研究 water sluice damage flood season operation study
  • 相关文献

参考文献3

  • 1武汉大学水利水电学院水力学流体力学教研室.水力计算手册(第2版)[M].北京:中国水利水电出版社,2006.
  • 2华东水利学院主编.水工设计手册(第1卷基础理论)[M].北京:水利电力出版社.1982.
  • 3SL265-2001.水闸设计规范[S].[S].,..

共引文献262

同被引文献10

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部